— Our Services
— About This Service
Complete bathroom installation and refurbishment tailored to period terraces, 1960s semis and bungalows across East Yorkshire. I manage demolition, first- and second-fix plumbing, waterproofing, tiling and fixture fitting, coordinating any specialist trades needed. Fifteen years of hands-on joinery and renovation means neat finishes, practical layout solutions and sensible scheduling. Jamie operates as a reliable sole and focused on tidy sites and clear communication.

— Our Process
I inspect the space, discuss plumbing and layout options, note any structural or drainage issues, then provide a clear written quote and timeline.
Controlled demolition, waste removal, and first-fix plumbing and stud work. I prepare solid substrates and waterproofing before tiling or fixture installation.
Final plumbing, sanitary fitting, tiling and sealants, followed by a full clean-up, functional checks and a client walkthrough with care instructions.
— Benefits
Over 15 years on-site experience in joinery and renovations means practical layouts, accurate finishes and solutions for Victorian terraces, semis and coastal properties.
I protect floors and fittings, keep a clean work area and leave the property ready to use — neat bath panels, flush tiling lines and crisp silicone joints.
I manage the job personally, coordinating electricians or plasterers when needed to keep the schedule on track and avoid unnecessary costs.
What I install: complete bathroom refurbishments including bath and shower fitting, concealed cisterns, vanity units, tile-setting, wet room conversions and replacement flooring. Work covers rip-out through to completion — structural adjustments, stud walls, plumbing reroutes and second-fix joinery for bespoke panels and shelving.
How I work: waterproofing and tiling are approached to trade standard using appropriate tanking or decoupling systems, solid tile backer boards and correct falls to waste on wet rooms. I carry out first-fix plumbing and then finish with accurate grout lines, sealed upstands and thermostatic shower valve installation where specified. If specialist electrical certification or gas work is required I coordinate with registered contractors to ensure compliance and safe handover.
— FAQ
Times depend on scope — a straightforward bathroom typically takes several working days from strip-out to finish, while wet rooms or jobs requiring structural work can take longer. I give an estimated timeline with the written quote and keep you updated if anything changes.
— Other Services